Steigenberger Hotel Berlin Kanzleramt

Project: Steigenberger Hotel Berlin Kanzleramt

Area: public area

Crafts: General contractor incl. HVAC and electricians

Project start: June 2019

Period: 1,5 months

Volume: 1-5 Mio €

Involved: 10-30 persons on site

July 23, 2019

KAMPER has been awarded the GC’s works at 4**** Steigenberger Hotel Am Kanzleramt

KAMPER has been awarded the general contractor’s works for the refurbishment of the public areas in this Steigenberger Hotel near the Federal Chancellery and within walking distance from the Brandenburg Gate. The challenge this time is to carry out the renovation and redesign works in the event and restaurant areas within a very short period of time while meeting the high quality standards Steigenberger is known for. A challenge not only for us but also for the hotel management, project control and architects. Connecting to the existing HVAC components will be as demanding as producing the delicate surfaces: Floor coatings with intricate bronze accents, real leather benches in classy brown shades, design lamps complementing the furniture produced in our workshops with bronze, brass and leather inlays. Project manager Michael Kumpitsch: “It is joy to work again with award-winning architects who we already worked with during the Steigenberger Bad Homburg refurbishment.”