Project start
May 2025
Period
40 months
Project participants:
approx. 150–200 people
Services:
General Contractor, Execution planning (architecture, building services, structural engineering, fire protection, building physics), demolition and clearance, shell construction, steel construction, carpentry, roofing and metalwork, façade refurbishment, external thermal insulation composite system (ETICS), window refurbishment and new windows, shading systems, fire doors, internal doors, internal and external plastering, screed, drywall construction, fire protection, raised access flooring, floor finishes, tiling, painting, locksmith works, glazing, joinery, heating, cooling, ventilation, sanitary installations, electrical engineering, measurement and control technology, medical gas supply, district heating, district cooling
Area:
Clinic, Diagnostics, Consulting Rooms, Operating Theatres, Conference Rooms, Classrooms